November Update Part 2 – with resources

Click here for the original Update for November

November Updates:

The recent extreme tide conditions have raised concerns regarding the upcoming King Tides.
The SINGLE most important step every every dock owner should take is to remove anything under your ramp that would prevent the dock from laying FLAT.
This will allow the dock to reseat into the cradle as the tide recedes even if it lifts out.
Next is pilings heights. (there are options below)
This page is to provide resources and also encourage homeowners and residents to remain calm and watch out for one another.

Thanks to resident Bill Hopper for photos, drawings and fixes, and thanks to other residents and contractors who have been informative and helpful!

What’s going on!

October 8th, 2026 the Channel Islands Harbor saw a high tide of over 8ft when we had a predicted tide of 6.6.
Many residents noticed the docks coming extremely close to the end caps raising increased concerns about the COMING King Tides this month and next!
WHAT IS COMING?
Provided by resident Bill Hopper
Thank you as well to local contractors Bautista Concrete Inc. and Dave Kott!
We are currently experiencing exceptionally high sea levels in Southern California.
This is due to several factors.
 
King Tides are forecast for November 24-26, December 23-25, and January 21-22.
You can see from the chart below that these are the highest tides of the month.
(Example: Wednesday November 25th at 8:42am the high tide will be at 7.09 feet.)
 

11/16 to 11/26 tides

Add to that a phenomena called a “Kelvin Wave” that could elevate sea levels by an additional 6-18 inches.
A “Kelvin Wave” is a slow moving pulse of warm, Less-dense water that acts like a subsurface bulge that pushes local water levels well above normal.
These exceptionally high sea levels pose several risks to those of us who have a dock here in the Channel Island Harbor.
1. The dock could possible rise high enough as to ride up and over the top of the cement pylons that hold it in place.
2. If your dock rises high enough it could also lift your ramp out of the 2 metal cradles that are bolted to the top of the sea wall.
There are several methods being used, by our neighbors, to minimizing these risks.
Here are a few suggestions. 
 
F

Extending Pilings

Please note: The Channel Islands Waterfront Homeowners Association (CIWHA) is sharing this information due to the unusual tide circumstances.
CIWHA does not have any business relationship with any vendors or contractors. This information is being given as a courtesy to homeowners as our docks and ramps are homeowners sole responsibility.

“Bautista Concrete Inc.” has been working feverishly to raise the height of cement pilings here in the harbor.
They place one of these 320-Lb. Cement cylinders on the existing piling raising it several feet.
The cost per extension is $750 per piling
To contact Bautista Concrete please text

YOUR NAME
Your Marina Address
The number of extensions (Pilings)
Isaiah Bautista : (805) 382-6951

 

Bautista Concrete Inc.” (805) 382-6951

Below are images of an extension by Bautista.

hole drilled image 2 image 3

 

Safeguarding Ramps

Make sure nothing is under your ramp!

ANYTHING THAT PREVENTS YOUR RAMP FROM LANDING FLAT AT HIGHEST TIDE
INCREASES THE RISK OF IT NOT LANDING BACK IN THE CRADLE!

Make sure nothing is under your ramp!

It is far safer to allow the ramp to disengage than to attempt to hold it to the cradle.
The ability to release is to protect the seawall and allow for removal and replacement when needed.
It is less costly to return the ramp later than to repair a seawall.

F

Alternative DIY method:

Submitted by homeowner Bill Hopper

Please use caution as this may result in catching on the rollers or if your piling or pylon guide has block instead of rollers.

Another method of raising the height of the cement pylons is to slide a PVC pipe over the top of the pylon.
I am using 3/8” thick, 30” long PVC pipe that has a 15” inside diameter.
 
This pipe is available through “COASTAL PIPCO” in Oxnard (805) 485-0455.
The pipe cost $28.07/ft. (Plus sales tax) part #150-100-pip-G-22
The pipe comes in 22ft lengths. They will cut shorter lengths for you. There is a 5ft minimum purchase and they charge $12 for each cut.
 

PVC From COASTAL-PIPCO  in Oxnard (805) 485-0455. > The pipe cost $28.07/ft. (Plus sales tax) part #150-100-pip-G-22

The cement pylon with the cap removed:

NOTE: Your Piling may not be smooth enough to slip the pipe over and your rollers or bars may not glide over the PVC.

 

The cement pylon with the cap removed.

 

BELOW
The same cement pylon with the PVC Pipe extension and the fiberglass cap in position.
 
Note: The fiberglass cap does not fit over or inside the PVC pipe. It rests on top.
To secure the cap I will fasten it with stainless steel screws to 4 boards that extend up 4″ from inside of the PVC pipe.
 

Pylon with PVC.

 

 
F

 QUICK FIX for guiding back over piling
Be ready approaching  HIGH TIDE!

Best to prepare in advance if this is your method!

If you are on your dock and the tide is rising and you fear the rollers will go over the top of the piling.

Editor note: I HAVE NOT DONE THIS – but have been told that you can guide the dock back down over the piling if you use a pole or two at the corners of the roller frame to maintain alignment after the frame crests the top of the piling. You might need someone at each piling. Make sure you reduce sway of the dock while doing this. The dock is floating and the tide does dot speed up and down… DON’T Panic!

NOTE: The board solution below would be best if you are present, in case something goes wrong!
Even better if you test this out in advance!

The board or poles should NOT be where the rollers will hit them – the rollers – or blocks – should run over the the spaces between.
Duct tape might get tangled in the rollers. 

Rachet straps might break or get pushed up.
If the boards get loose they could jam things up.

If you have boat hooks,  or poles on hand – to put in the corners of the brace that holds the rollers surrounding the pylon guide it back down as the tide goes out. Having them secured in place in advance is an idea – if you are PRESENT – just watch for tape getting tangled or coming off!

Newport Fire department has an instagram video showing board and rachet straps – A quick fix would be to secure 4 wooden boards to the pylon with long heavy duty hose clamps or ratchet straps.

HOWEVER  – I have been told that this could cause problems if you are not present and the boards, or straps break loose – so we are only posting this with the idea of you being there!   

Thanks to Bill Hopper for demo image!

 

Secure boards to pylon

F

THANKS to Bill Hopper, and all the fine people who have chimed in!

PLEASE DO OBSERVE THE NO WAKE ZONE

Especially during high tides! 
Even small wakes can stress docks, pylons and cleats!
Print the signs and put them on your dock and in your boat windows!

F

We welcome your comments and questions – however it may take some time for a response!

Questions on High Tide Prep

14 + 14 =

F